NATIONAL INSTITUTE OF WIND ENERGY
भारत सरकार | GOVERNMENT OF INDIA
  • Skip to Main Content
  • Site Map


  • Facebook Twitter
NIWE Logo

NATIONAL INSTITUTE OF WIND ENERGY

Ministry of New and Renewable Energy, Government of India

Indian Emblem
Azadi Ka Amrit Mahotsav Logo
  • Home
  • About Us
    • Director's Message
    • Background
    • Charter
    • Organizational Chart
    • Quality Policy
    • Management System Certificate
    • Staff Profile
  • Departments
    • Research And Development
    • Certification And Information Technology
    • Standards & Regulation
    • Testing
    • Wind Resource Assessment
    • Offshore Wind Development
    • Skill Development & Training
    • Finance & Administration
  • Media
    • Awards
    • Citizen Charter
    • Gallery
    • Events
  • Services
  • Careers
  • Tenders
  • RTI
  • Documents
    • General Information
    • Newsletter
    • Annual Reports
    • Technical Reports
    • Revised Guidelines For Wind Power Project
    • Wind Power Policy
    • WEG Installation
    • Related Links
    • Records Retention Schedule
    • FAQS
  • Contact Us
  • Azadi ka Amrit Mahotsav 2021-22 to commemorate the 75 years of progressive Independent India

    1. Home
    2. Documents
    3. Azadi ka Amrit Mahotsav
    4. 2021-22

    NIWE with the support of MNRE has scheduled eight events (each event are scheduled for a week duration) to commemorate the 75 years of India's Independence (Azadi ka Amrit Mahotsav).

    The seventh event, “RE Camp on the operations of Wind Turbine” at Kayathar (for 15 and 19 age group) was conducted successfully during 30th May to 04th June 2022.

    The announcement about the event along with the instructions and venue were hosted on NIWE website and circulated through Social Media pages along with the below given Flyer.

    Instructions
    1. Interested students may register on or before 15.05.2022 through the google form link https://forms.gle/e2eCtuMXH2NGiGkt5
    2. The registration is free.
    3. The selected students will have to reach WTRS, Kayathar, Tamil Nadu.
    4. The students have to make their own arrangement for transportation, accommodation and food.
    5. Lunch and refreshments will be served by NIWE.
    6. Certificate will be provided to the participants
    Registration
    S.No Date Time Activity
    1 30.05.2022 and 04.06.2022 10.00 AM to 05.00 PM Registration
    About NIWE
    Topics are covered in the following areas :
    Introduction to Wind Energy Technology
    Overview of Wind Turbine Components
    Electrical System in Wind Turbines
    Wind Turbine Generators
    The Aerodynamic aspects of Wind Turbine
    Control and Protection System in Wind Turbine
    Wind Resources Assessment & Techniques
    Design and Layout of Wind farms
    Site selection for Wind Monitoring Stations
    Economic Analysis of Wind Power Development
    Installation and Commissioning of Wind Turbine
    Operation and Maintenance aspects of Wind Farms
    Wind Turbine Testing & Measurement Techniques
    Certification of Wind Turbine
    Grid Integration of Wind Turbines
    Forecasting of Wind and Energy Production
    Overview of Wind Turbine Research & Testing Station facilities
    Field visit to Large & Small Wind Turbine Testing Facilities
    Field visit to Wind Monitoring Station
    Field visit to Wind - Solar Hybrid system
    Field visit to Sub- station

     

    RE camp has been attained its main objective. It created awareness and provided a good foundation on the principles of engineering behind wind energy technology and its operations in the field during all the seasons. The camp was very helpful to the participants to facilitate a valuable forum for dialogue and open exchange of views and experiences with professionals.

    The participants were got knowledge about the wind energy technology, wind resource assessment, aerodynamic technology, wind components, wind electrical generator and operations of wind turbine through the class room lectures. They were also got added knowledge practically, through field visit of wind monitoring station, wind farm, research and testing facilities of large and small wind turbines and substation. Participation certificates were distributed to the participants at the end of the RE camp.

    The structure and organization of RE camp was highly appreciated by the participants. The participants were very much satisfied by the quality of the content they got from the training and expressed thanks to NIWE and MNRE for arranging the free RE camp under the programme of Azadi ka Amrit Mahotsav.

    Gallery of the RE Camp at Kayathar
    Explaining Wind Energy Technology Participants concentrating the lecture
    Explaining aerodynamic technology Explaining operations of wind turbine
    Participants visiting Metmast Explaining control panel of the Wind turbine
    Explaining Power evacuvation facility of Kayathar substation Explaining wind turbine blade technology
    Explaining gear box and main shaft of wind turbine Explaining 75 kW Solar photovoltaic power plant
     
    Certificate Distribution
       
       

     

    Group Photo of the students at Kayathar
    Participants in front of 2 MW Wind Turbine at Kayathar Participants in front of Kayathar Building Entrance
    Participants in front of WTTS Campus, Kayathar Participants at Wind Farm, Kayathar

      ABOUT US
    • Director General's Message
    • Background
    • Charter
    • Organizational Chart
    • Quality Policy
    • Staff Profile
      DEPARTMENTS
    • Research and Development
    • Certification & Information Technology
    • Standards & Regulation
    • Testing
    • Wind Resource Assessment
    • Offshore Wind Development
    • Skill Development & Training
    • Finance & Administration
      INFORMATION
    • General Information
    • Offshore Wind Energy Portal
    • Internship Programme for UG/PG students
    • Apprenticeship Training
    • Library
    • Careers
    • Tenders
    • Wind/Solar Data Sale
    • Calibration of Solar Instruments
    • NIWE Website Security Audit
      EVENTS
    • Global Wind Day 2022 & Silver Jubilee Celebration of NIWE
    • Gallery
    • National Training
    • Training Calendar 2025-26
    Picture 1
    Picture 2
    Picture 3
    Picture 4
    Picture 5
    Picture 6
    Picture 7
    Picture 8
    Picture 9
    Picture 10

    Website Policies | Disclaimer | Glossary | Help | Web Information Manager | Sitemap | Route Map | Tenders | Careers |

    © All Rights Reserved | Content Owned by National Institute of Wind Energy

    Last update on : Oct 16,2025

    Total Visitors: 194737